Service Restored at 05:33 PM on 1/31/19: Both data centers have returned to normal power and generators have shutdown. All building switch closets should now have power and building wired/wireless/phone service should be on-line and functional again.

Update reported at 04:53 PM on 1/31/19: Xcel replaced some hardware in the SPSC building and has restored the function of the power system to a high degree. Power is still on backup, but teams are working to transfer power back over to the normal system.

Update reported at 11:08 am on 1/31/19: Facilities Management Operations reported power outages also affecting the LSTR, WIND, CASA, and SPSC buildings on East Campus

Issue reported on 1/31/19 at 10:43 am: There's an Xcel power outage on east campus, networking services are currently down in the SEEC and SEEL buildings. No ETA from Xcel. More information will be posted when available