OIT has kicked off a project that will upgrade all network switches across campus, as part of a normal life-cycle replacement schedule, by the end of 2020. The replacements will take place on a building-by-building basis during the evening hours of business days, from 6 pm to 10 pm. This will cause network outages, for both wired and Wi-Fi networks, including Cisco VoIP phones, from 30 minutes up to 160 minutes based on the number of switches to be replaced. The first phase of replacements will run from November 26 through January 23. Affected buildings will be listed on the Network Switch Upgrade project page as well as below.
Impact
Network outages, for both wired and Wi-Fi networks, including Cisco VoIP phones, from 30 minutes up to 160 minutes based on the number of switches to be replaced.
Affected Services
Wired network, UCB Wireless, UCB Guest, eduroam, Cisco VoIP phones
Affected Buildings - Phase 1
Please see the Network Switch Upgrade project page for the phase one building schedule.
- ARCE
- HSSC
- HFOC
- MSSC
- TRAN
- COMP
- SLL
- TB15
- TB84
- GH
- ECPDC
- WVRC
- WVHP
- CINC
- HPCF
- WALN
- RL2
- LSRL
- IBG
- BIOT
- LSTR
- ARL
- SEEC
- SEEC
- SEEL
- SPSC
- LITR